The stages run in the order the photos were posted: strip-out first, then the new shopfront and shutter, then plastering, then the floors, then the last jobs, then the open shop.

Stage 01 of 06

Strip-out

The old lining and ceiling came out first, back to bare studs and the open ceiling void, so the new layout could be set out on a clean shell.

What the photos show

In these photos the lining is off one wall, leaving bare timber studs, and the ceiling is open with cabling and ducting hanging down. Timber and board offcuts are piled on the floor, and a scaffold tower and a ladder stand in the room. Another photo looks up at bare ceiling joists with the shop window at the far end.

PLATE 01 · LOCA BLOWDRY BAR · STRIP-OUTDuring works
Shop interior stripped back to timber studs, with plasterboard offcuts piled on the floor and a scaffold tower in the middle of the room.
Site notes (3)
  1. 01Bare studs The lining on the left wall is off, leaving the bare timber studs.
  2. 02Open ceiling The ceiling is open, with cabling and ducting hanging down.
  3. 03Scaffold tower A scaffold tower stands in the middle of the room, beside a stepladder.
PLATE 02 · LOCA BLOWDRY BAR · STRIP-OUTDuring works
Shop interior during strip-out with bare walls, a scaffold tower and a ladder at the back.
PLATE 03 · LOCA BLOWDRY BAR · CEILING OPENDuring works
Shop ceiling opened up, showing the metal grid and boards above head height.
Stage 02 of 06

Shopfront and shutter

A new shopfront frame and a roller shutter went into the front opening, with the glass protected while work carried on inside.

What the photos show

One photo shows the old shopfront opening with ladders and tools out on the pavement, a red bench among them, and people working inside. Another is taken from inside the shop with the glazed door open to the street. In the new cream frame, the glass carries printed sheeting with the LOCA name, and a roller shutter sits behind the glazed door.

PLATE 04 · LOCA BLOWDRY BAR · SHOPFRONT AND SHUTTERDuring works
New shopfront with a cream frame, protective film printed with the LOCA name over the glass and a roller shutter behind the glazed door.
Site notes (3)
  1. 01Shutter A roller shutter sits behind the glazed door.
  2. 02Frame The new cream frame sits in the shopfront opening, set into the existing front.
  3. 03Glass The glass carries printed film with the LOCA name.
PLATE 05 · LOCA BLOWDRY BAR · SHOPFRONT OPENINGDuring works
Workers on site at the old shopfront opening with ladders, tools and a bench on the pavement.
PLATE 06 · LOCA BLOWDRY BAR · SHUTTER INSTALLATIONDuring works
View from inside the shop through the open glazed door to the street, with a stepladder and bags of plaster on the floor.
Stage 03 of 06

Plastering

Walls and ceiling were plastered with the downlights already wired in, ready for paint and floor.

What the photos show

Walls and ceiling are plastered in these photos, with downlights fitted or wired in. A heater, ladders and buckets are standing about, and the floor in the small room is bare boards. Another photo shows round openings cut in the ceiling for lights, with a scaffold tower, buckets and a trowel on the floor.

PLATE 07 · LOCA BLOWDRY BAR · PLASTERINGDuring works
Small room with freshly plastered walls and ceiling, downlights wired in, an oil-filled heater and ladders on a bare boarded floor.
Site notes (3)
  1. 01Plaster Walls and ceiling are plastered, with a smooth finish across the whole room.
  2. 02Downlight A downlight sits in the bare plastered ceiling, its wires still showing.
  3. 03Heater An oil-filled heater stands in the room beside the freshly plastered walls.
PLATE 08 · LOCA BLOWDRY BAR · PLASTERINGDuring works
Plastered shop room with downlights, a folding aluminium ladder and equipment on the floor.
PLATE 09 · LOCA BLOWDRY BAR · PLASTERINGDuring works
Narrow shop room with plastered walls, builders’ buckets and a ladder.
Stage 04 of 06

Tiling and parquet

The main room got a parquet-pattern floor and white skirting; the corridor and WC were tiled.

What the photos show

The main room has a parquet-pattern floor, painted walls and white skirting, with a scaffold tower still standing at the back. A separate photo shows the narrow corridor, with a patterned tile floor leading to a wall-hung toilet at the far end and a bucket in the foreground.

PLATE 10 · LOCA BLOWDRY BAR · PARQUET FLOORDuring works
Shop floor with a large parquet-pattern floor laid, painted walls, white skirting and a scaffold tower at the back.
Site notes (3)
  1. 01Floor The parquet-pattern floor runs across the whole room.
  2. 02Skirting White skirting runs along the painted walls beside the floor.
  3. 03Doorways Door openings at the back are framed and painted; the scaffold tower is still up.
PLATE 11 · LOCA BLOWDRY BAR · PARQUET FLOORDuring works
Shop with the parquet-pattern floor laid and a metal railing in the foreground.
PLATE 12 · LOCA BLOWDRY BAR · CORRIDOR TILINGDuring works
Narrow corridor with a patterned tile floor leading to a toilet at the end.
Stage 05 of 06

Final touches

Signage went up on the timber fascia and the last jobs inside were cleared and cleaned.

What the photos show

Gold LOCA letters are fixed to a slatted timber fascia above the shopfront glazing. Inside, the photos show a ladder, a broom, a vacuum cleaner and bubble wrap on the floor, with the salon chairs still in plastic wrap and boxes and tools lying about.

PLATE 13 · LOCA BLOWDRY BAR · SIGNAGEDuring works
Gold LOCA letters fixed to a slatted timber fascia above the new shopfront glazing.
Site notes (3)
  1. 01Lettering The gold LOCA letters are fixed to the timber fascia.
  2. 02Fascia The fascia is made up of horizontal timber slats fixed across the front.
  3. 03Loose wires Red wires hang loose above the door.
PLATE 14 · LOCA BLOWDRY BAR · FINAL TOUCHESDuring works
Salon floor with a ladder, a vacuum cleaner and tools left out during the last jobs.
PLATE 15 · LOCA BLOWDRY BAR · FINAL TOUCHESDuring works
Salon interior with furniture in place, a vacuum cleaner and cleaning under way.
Stage 06 of 06

Open

The finished shopfront and salon, with styling stations, lit shelving and the parquet-pattern floor.

What the photos show

The last two photos are labelled finished. The first is the shopfront with the lettering Blowdry Bar and Aesthetic and Beauty either side of LOCA, a stepladder at the right edge and people inside the shop. The second is taken at night through the shop window and shows three arched mirrors, green chairs and lit glass shelving with products on it.

PLATE 16 · LOCA BLOWDRY BAR · SHOPFRONTFinished
Finished LOCA Blowdry Bar shopfront with gold lettering and glazed door.
PLATE 17 · LOCA BLOWDRY BAR · SALONFinished
View through the shop window at night into the finished salon, with three arched mirrors, green chairs and lit glass shelving.
Site notes (3)
  1. 01Stations Three styling stations with arched mirrors run along the long wall.
  2. 02Shelving Glass shelves with built-in lighting sit in the joinery behind the stations.
  3. 03Floor The parquet-pattern floor runs through the finished salon to the back.
About these photos

Every photo on this page is our own. Only the last two are labelled finished; all the others are labelled during works.

Other projects

All projects

Tell us about the job

A phone call or a WhatsApp message with a few photos is enough to start. We will talk it through, arrange a visit to look at the work and then put the scope in writing. If you would rather write it all down, use the form and we will come back to you.

Tell us where the job is, what you want done and roughly when. We cover N13, N14, N21, N9, N18, EN1, EN2, EN3 and North London, for homes and for shops.