NORTH LONDON BUILDER · LTD SINCE 2016

Homes refurbished, start to finish. Shops fitted out, stage by stage.

T.O.D. Building Contractors Ltd is a building contractor in Palmers Green, North London (N13). We refurbish homes and fit out shops, and we photograph our jobs as they go, so you can see how we work before you call.

Company no. 10175132 · verify on Companies House ↗

PLATE 01 · FLAT · KITCHENFinished
Finished kitchen with light handleless units, a window over the sink and an item still wrapped in plastic on the worktop.
PLATE 17 · LOCA BLOWDRY BAR · SALONFinished
View through the shop window at night into the finished salon, with three arched mirrors, green chairs and lit glass shelving.
  1. 01Stations Three styling stations with arched mirrors run along the long wall.
  2. 02Shelving Glass shelves with built-in lighting sit in the joinery behind the stations.
  3. 03Floor The parquet-pattern floor runs through the finished salon to the back.

One team for the whole job, or the one trade you need.

We take a refurbishment from strip-out to handover, or come in for a single trade. These are the six kinds of work we do, each with its own page showing real photos from our jobs.

  1. 01Kitchens and bathroomsStrip-out to finished room: units, tiling, plumbing and decorating in one team.
  2. 02Plastering and decoratingFlat plastered walls and ceilings, then painted, in homes and shops.
  3. 03Flooring and tilingWood-effect and parquet-pattern floors, wall and floor tiles, laid to a plan.
  4. 04Plumbing and heatingPipework, radiators, bathroom and kitchen plumbing, alongside the building work.
  5. 05Shop fit-outsStrip-out, shopfront, plastering, flooring and the final fit for shops and salons.
  6. 06Lofts and extensionsLoft conversions and extensions for North London homes, scoped on a site visit.
Featured project · shop fit-out

LOCA Blowdry Bar: from stripped shell to open door.

A shop in North London turned into a blow-dry bar. We stripped it back, fitted the shopfront and shutter, plastered, laid the parquet-pattern floor and finished the fit-out. Here is each stage as it stood on site.

See the whole project
  1. Stage 01
    PLATE 03 · LOCA BLOWDRY BAR · CEILING OPENDuring works
    Shop ceiling opened up, showing the metal grid and boards above head height.

    Strip-out

    The old lining and ceiling came out first, back to bare studs and the open ceiling void, so the new layout could be set out on a clean shell.

  2. Stage 02
    PLATE 06 · LOCA BLOWDRY BAR · SHUTTER INSTALLATIONDuring works
    View from inside the shop through the open glazed door to the street, with a stepladder and bags of plaster on the floor.

    Shopfront and shutter

    A new shopfront frame and a roller shutter went into the front opening, with the glass protected while work carried on inside.

  3. Stage 03
    PLATE 09 · LOCA BLOWDRY BAR · PLASTERINGDuring works
    Narrow shop room with plastered walls, builders’ buckets and a ladder.

    Plastering

    Walls and ceiling were plastered with the downlights already wired in, ready for paint and floor.

  4. Stage 04
    PLATE 12 · LOCA BLOWDRY BAR · CORRIDOR TILINGDuring works
    Narrow corridor with a patterned tile floor leading to a toilet at the end.

    Tiling and parquet

    The main room got a parquet-pattern floor and white skirting; the corridor and WC were tiled.

  5. Stage 05
    PLATE 15 · LOCA BLOWDRY BAR · FINAL TOUCHESDuring works
    Salon interior with furniture in place, a vacuum cleaner and cleaning under way.

    Final touches

    Signage went up on the timber fascia and the last jobs inside were cleared and cleaned.

  6. Stage 06
    PLATE 17 · LOCA BLOWDRY BAR · SALONFinished
    View through the shop window at night into the finished salon, with three arched mirrors, green chairs and lit glass shelving.

    Open

    The finished shopfront and salon, with styling stations, lit shelving and the parquet-pattern floor.

Before and after, in our own pictures.

These three collages were put together by T.O.D. from our own phone photos. The left side of each is the room as we found it, the right side is the same room once the work was done.

They are ordinary rooms: one with a window fitted with shutters, a kitchen area with a bar-style counter and a worktop area with new units and a built-in oven. We show them as they are, so you can judge the finish for yourself.

Before and after collage of a room with a window, the window fitted with shutters in the after picture.Before and after collage of a kitchen area, with a bar-style counter in the after picture.Before and after collage of a kitchen worktop area, with new units and a built-in oven in the after picture.
Three T.O.D. jobs, before and after

How a job runs, in the order it happens.

Most of the worry on a building job comes from not knowing what happens next. This is the order we work in, from the first visit to the day we hand the keys back.

How we work, in detail
  1. 01

    A visit

    We come and look at the job, ask what you want done and tell you plainly what we see.

  2. 02

    A written scope

    You get the work written down, so both sides know what is included before anything starts.

  3. 03

    A start date agreed

    We fix a start date with you and say what needs to be in place before we arrive.

  4. 04

    Payment in stages

    Payments follow the stages of the work, as set out in the written scope.

  5. 05

    A tidy site

    We protect the parts of your home we are not working on and keep the site tidy as we go.

  6. 06

    Snag list and handover

    We walk the finished job with you, list anything to put right, fix it, then hand over.

A registered company, you can check.

T.O.D. Building Contractors Ltd has been a limited company since 2016. These details come from the public record at Companies House, so you can compare them with what we tell you.

Open our Companies House record ↗

Every photo on this site is our own work: phone photos, no stock, no AI.

Companies House details
Company nameT.O.D. Building Contractors Ltd
Company number10175132
Incorporated11 May 2016
Registered office10a Aldermans Hill, London N13 4PJ
DirectorTayfun Osman Duruel (Osman)
Registered tradesPlumbing and heating, Plastering, Floor and wall covering, Painting

Questions people ask before they ring.

The short answers below are how we normally put it. For anything specific to your home or shop, the site visit is where we go through it properly.

Do you do the whole job or just one trade?

Both. We can take a refurbishment from strip-out to handover, or come in for a single trade such as plastering, tiling, flooring or plumbing. On the site visit we agree which parts you want us to cover.

Which areas do you cover?

We work across North London, mainly N13, N14, N21, N9, N18 and EN1 to EN3. If you are just outside those postcodes, ask: we will tell you on the phone.

Can I live in the house during the works?

It depends on the job. A single bathroom is very different from a full refurbishment. We talk it through on the site visit and say plainly what is realistic for your home.

How do quotes work?

We visit, look at the work and write down the scope. You then get a written quote that sets out what is included. Anything not yet decided is explained on the visit.

Do you work on shops?

Yes. Our LOCA Blowdry Bar project covers strip-out, shopfront and shutter, plastering, flooring and the final fit-out, and we show it stage by stage on the projects page.

Tell us about the job

A phone call or a WhatsApp message with a few photos is enough to start. We will talk it through, arrange a visit to look at the work and then put the scope in writing. If you would rather write it all down, use the form and we will come back to you.

Tell us where the job is, what you want done and roughly when. We cover N13, N14, N21, N9, N18, EN1, EN2, EN3 and North London, for homes and for shops.